Maintenance Update St Joseph’s and St Patrick’s 2021
• St Joseph’sNew guttering; Painting outside completed (Three patches need plastering after winter and painted); Downpipes and Drains cleared and unblocked; Microphone replaced; Roof checked after repairs last year; Statue checked it is secured by bolt through façade to roof trusses.• St Patrick’sNew down pipes; Plaster and painted inside; RoofContinue Reading